Engineering Fees


arrow Adjustment/Consolidation Plat

arrow Final Map, Improvements Plans and Grading Plans

arrow Parcel Maps

arrow Sewer Fees

arrow Development Impact Fee (DIF)

arrow Traffic Signal Fees

arrow Minor Construction Permit

arrow Encroachment Permits

arrow Inspection Fee


1. Adjustment / Consolidation Plat

a. $1,050.00 per plat resulting in adjustment of property lines.

b. $950.00 per plat resulting in consolidation of two or more parcels

c. $200.00 filling fee for certificate of compliance

2. Final Map, Improvement Plans and Grading Plans

Note: The following are the required deposits to cover the City’s full cost including overhead incurred in conjunction with review and processing of maps & improvement plans. Owner/ developer is responsible for the required adjustment prior to and approvals.

Final Maps & Improvement Plans

 

Public Streets

Private Streets

No. of Units

Plan Check

Inspection

Plan Check

Inspection

< 5

$2,000.00 min

$2,000.00 min

$2,000.00 min

$2,000.00 min

5-25

$12,000.00

$8,000.00

$6,000.00

$6,000.00

26-100

$16,000.00

$14,000.00

$12,000.00

$12,000.00

101-200

$20,000.00

$20,000.00

$15,000.00

$15,000.00

201 & UP

$100/unit

$100/unit

$65/unit

$65/unit


Grading Plans

< 5

$2,000.00 min

$2,000.00 min

$2,000.00 min

$2,000.00 min

5-25

$5,000.00

$8,000.00

$3,500.00

$5,000.00

26-100

$10,000.00

$14,000.00

$8,000.00

$12,000.00

101-200

$15,000.00

$20,000.00

$12,000.00

$15,000.00

201 & UP

$75/unit

$75/unit

$60/unit

$75/unit

3. Parcel Maps

Note: The following are the required deposits to cover the City’s full cost including overhead incurred in conjunction with review and processing of maps & improvement plans. Owner/ developer is responsible for the required adjustment prior to and approvals.

a. $3,478.00 for Tentative Parcel Map Submittal

b. $500.00 for Tentative Parcel Map Waiver Submittal

c. $2,500.00 for Final Parcel Map Submittal

4. Sewer Fees

a. $45.00 for Sewer Connection Administrative fee

b. $3,478 per Equivalent Dwelling Unit Sewerage Participation Fee

c. $6,990.00 plus $174.73 per  foot of chargeable length over 35 feet

for 4" lateral; or $7,017.95 plus $178.10 per foot of chargeable length over 35 feet for 6" Later (one required for each building proposed) installation fee for lateral from main to property line;

Tap lateral installed by contractor other than City intomain: $528.00 per

d. 4” lateral connection OR $607.00 per 6” lateral connection.

arrow For more detailed information on Sewer Fees, please click here.

5. Development Impact Fees (DIF)

Your proposed project is subject to this fee to cover costs of expanding the City's facilities or to cover the costs of improvements in the City east of I-805 and State Route 125 (for more details see Development Checklist for Municipal Code Requirements)

6.  Traffic Signal Fees

For detail see Development Check List for Municipal Code Requirements or call Engineering Division at (619) 691-5024.

7. Minor Construction Permit

a. $250.00 application fee

b. $175.00 traffic control fee (if applicable)

c. Inspection fee based on the cost estimate for work to be performed within public right-of-way (see table below)

8. Encroachment Permits

a. $275.00 for those permits reviewed by the City Engineer

b. $850.00 for those reviewed by the City City Council.

c. Inspection fee for either type of encroachment is based on the cost estimate of the work (see table below)

d. $50.00 Temporary Encroachment for storage of building material in City right-of-way permit application.

 

9. Inspection Fees

Inspection fees are determined by multiplying the estimated construction cost by the appropriate fee percentage as detailed in the table below.

Estimated Construction Cost

Inspections

$0-1,999

10%

2,000 – 4,999

8%

5,000 – 9,999

6%

Note: for estimated construction costs over $10,000.00 the fee shall be a deposit to cover the City’s full cost including overhead incurred in plan review and inspection for encroachment permits & construction permits.

Contact Us

For further information on Engineering fees, please call (619) 691-5021. For further contact information, click here.

City Of Chula Vista

 

 

Arrrow Back To Top  

   


©2012 City of Chula Vista. All Rights Reserved.

Employees Only