|
Subdivision Manual
Use this page to access various sections of the Subdivision Manual
| Chapter
1 |
Provides definitions
to terms as used in this manual, briefly describes the documents
that control land development processing, and provides a general
overview of submittal requirements and processing flow charts. |
| Chapter
2 |
Provides specific guidelines
for processing tentative and final maps for subdivisions (Section
2-100) and minor subdivisions (Section
2-200). Each subsection of this chapter includes a flow
chart, sample map cover sheet and checklist.
Section 2-300 of this chapter details the City's surveying
requirements including procedure of survey guidelines, monumentation
requirements, and monument verification. Section
2-400 covers adjustment and consolidation plats and Section
2-500 covers certificates of compliance. Formats for typical
jurats, certificates, bonds, and agreements are included in
Section
2-600. |
| Chapter
3 |
Addresses general design
criteria and covers lot design and layout (Section
3-100) drainage requirements, storm drain design, and urban
run-off requirements (Section
3-200), sewer requirements and sewer system design (Section
3-300), and street and road design and construction criteria
(Section
3-400). |
| Chapter
4 |
Provides specific guidelines
for processing construction plans including improvement plans
(Section
4-100), grading plans (Section
4-200), an overview of landscape and irrigation plan requirements
(Section
4-300), plans for construction permits (Section
4-400) and revisions, construction changes and as-builts
(Section
4-500). Each section covers form content and processing
for each type of plan. Sections 4-100
and 4-200
also contain flow charts, sample title sheet, checklists and
typical notes for improvement and grading plans respectively.
|
| Chapter
5 |
Includes a summarize
list of initial plan check deposits and fees (Section
5-101 & 5-102), a list of typical fees due at final
map approval or building permit issuance (Section
5-103), a summary of blueline an mylar submittal requirements
and requirements for first submittals (Section
5-201 & 5-202) and a list of names and titles of government
officials responsible for signing various maps and documents
(Section
5-300). It is expected that one or more of these sections
will be modified regularly by City Council action. Users of
this manual should verify that they have the current copy of
each appendix. |
Subdivision Manual Errata Sheet
Sample Drawings Table
|