Wastewater Master Plan
Wastewater Master Plan Report (2005)
Wastewater Master Plan Appendices (2005)
- A. Response to City Comments
- B. SANDAG Population Based Flow Projection Summaries
- C. ADS Flow Monitoring Report
- Flow Monitor Chulavista_CV1 - May 23, 2003 through June 5, 2003
- Flow Monitor Chulavista_CV2 - May 23, 2003 through June 5, 2003
- Flow Monitor Chulavista_CV3 - May 23, 2003 through June 5, 2003
- Flow Monitor Chulavista_CV4 - May 23, 2003 through June 5, 2003
- Flow Monitor Chulavista_CV5 - May 23, 2003 through June 5, 2003
- Flow Monitor Chulavista_CV6 - May 23, 2003 through June 5, 2003
- Flow Monitor Chulavista_CV7 - May 23, 2003 through June 5, 2003
- Flow Monitor Chulavista_CV8 - May 23, 2003 through June 5, 2003
- Temporary Flow Monitoring Study
- D. Hydraulic Model Flow Projection Summaries & Model Land Use and Wastewater Loading Calculations
- E. Model Results
- F. General Plan Update Land Use Station
- G. Pump Station Operational Data
- H. City of Chula Vista March 18, 2003 City Council Agenda Statement regarding Current Sewerage Capacity Charge
- I. GASB 34 Final Infrastructure
- J. Valuation Analysis of Pipeline Assets
- K. City of San Diego Wastewater Department Wastewater Cost of Service Study October 2003
- L. Updated Financial Plans
- M. Regional Wastewater Disposal Agreement
- Agreement
- Exhibit A
- Exhibit B
- Exhibit C
- Exhibit D
- Optimized Reclaimed Water Distribution System North City Water Reclamation Plant
- Ordinance 18517 (May 18, 1998)
- N. Sewer Facility Replacement Fee Analysis
- O. Chula Vista Subdivision Manual - Sewer Design
- P. Chula Vista Sewer Overflow Response Plan
Note: Some portions of report were split up by page due to a file upload size limit for this site. We do apologize for any inconvenience.
|