Wastewater Master Plan Report
(2005)
|
| Table of Contents |
| Executive Summary |
| Chapter 1 (Introduction) |
| Chapter 2 (Study Area) |
| Chapter 3 (Wastewater Generation Analysis) |
| Chapter 4 (Sewer Capacity Evaluation) |
Figure 4-1 (Master Plan Sewer Models)
|
Figure 4-2 (Flow Monitoring Locations)
|
Figure 4-22 (Recommended Improvement Reaches)
|
| Chapter 5 (General Plan Update Capacity Evaluation) |
Figure 5-4 (Alternative 1 Impacts)
|
Figure 5-5 (Alterantive 2 Impacts)
|
Figure 5-6 (Alternative 3 Impacts)
|
Figure 5-7 (Preferred Alternative Impacts)
|
| Chapter 6 (Sewer Pump Station Assessment and Rehabilitation Plan) |
Figure 6-1 (Existing Pump Stations)
|
| Chapter 7 (Sewer System Standards and Emergency Procedures) |
| Chapter 8 (Capital Improvement Plan) |
| Chapter 9 (Capacity Fee Update Study and Capital Facilities Financing Plan |
| |
Exhibits
|
1. North West Sewer Model
|
2. Telegraph Canyon East Sewer Model
|
3. Poggi Canyon Sewer Model
|
4. Salt Creek Sewer Model
|
5. Proposed Sewer CIP
|
| |
Wastewater Master Plan Appendices (2005)
|
| A. Response to City Comments |
| B. SANDAG Population Based Flow Projection Summaries |
| C. ADS Flow Monitoring Report |
1. Flow Monitor CV1 - May 23, 2003 through June 5, 2003
|
2. Flow Monitor CV2 - May 23, 2003 through June 5, 2003
|
3. Flow Monitor CV3 - May 23, 2003 through June 5, 2003
|
4. Flow Monitor CV4 - May 23, 2003 through June 5, 2003
|
5. Flow Monitor CV5 - May 23, 2003 through June 5, 2003
|
6. Flow Monitor CV6 - May 23, 2003 through June 5, 2003
|
7. Flow Monitor CV7 - May 23, 2003 through June 5, 2003
|
8. Flow Monitor CV8 - May 23, 2003 through June 5, 2003
|
9. Temporary Flow Monitoring Study |
| D. Hydraulic Model Flow Projection Summaries & Model Land Use and Wastewater Loading Calculations |
| E. Model Results |
| F. General Plan Update and Land Use Station |
| G. Pump Station Operational Data |
| H. City of Chula Vista March 18, 2003 City Council Agenda Statement regarding Current Sewerage Capacity Charge |
| I1. GASB 34 Final Infrastructure |
I2. Valuation Analysis of Pipeline Assets |
| J. City of San Diego Wastewater Department Wastewater Cost of Service Study October 2003 |
| K. Updated Financial Plans |
| L. Regional Wastewater Disposal Agreement |
Exhibit A
|
Exhibit B
|
Exhibit C
|
Exhibit D
|
Optimized Reclaimed Water Distribution System North City Water Reclamation Plant
|
Ordinance 18517 (May 18, 1998)
|
| M. Sewer Facility Replacement Fee Analysis |
| N. Chula Vista Subdivision Manual - Sewer Design |
| O. Chula Vista Sewer Overflow Response Plan |
| |
Note: Some portions of report were split up by page due to a file upload size limit for this site. We do apologize for any inconvenience.