TopRound
City Of Chula Vista
Like Us on Facebok   Follow us on Twitter - ThinkChulaVista!   

   
City of Chula Vista Site Map Contact Us City Calendar of Events Frequently Asked Questions City Services What's New In Chula Vista Chula Vista Attractions About Chula Vista Chula Vista Home
Development Services Down Arrow
Development Svcs CenterDown Arrow
 

Process Guides
Forms & Specifications
Fee Information
FAQs

       
  Development Services
       

   

Single-Family Dwelling / Duplex

This Guide is designed to help you through the permitting and Wood Framingconstruction processes associated with a new single-family dwelling/duplex. A Single-family dwelling/duplex is defined as any building or portion thereof that contains not more that two dwelling units. A building permit is required for a new single-family dwelling/duplex. For additional information please see "Single-Family Residences/Duplexes: Minimum Submittal Standards", Form 4601.

The Chula Vista Zoning Ordinance applies to the use and location of all structures, including those not requiring a building permit. All new structures must therefore be reviewed by the Planning Division to ensure the structure meets the requirements of the zone. Please check with Planning staff to ensure your proposed structure meets all standards, such as setbacks from property lines and adjacent structures, allowable height, and lot coverage.

Projects requiring discretionary approvals (Design Review Committee, Conditional Use Permit .. etc.) must be approved before applying for a building permit.

For us to accept your permit application, you must provide us with a complete submittal package. A complete submittal package consists of the following:

  1. A completed "New Single & Multi-Family Worksheet", Form 4611.
  2. Four copies of a Plot/Site Plan showing the general layout of the building site, location of new and existing buildings, retaining walls and other structures. Please review our handout, "How To Prepare A Residential Plot Plan", Form 4595.
  3. Four copies of construction plans and details, including but not limited to; title sheet, foundation plan, floor plan, elevations, roof plan, cross sections, framing plans and details and other applicable plans as listed in the "New Single & Multifamily Worksheet", Form 4611.
  4. Two copies of each of the following documents are required; Soils Report (two additional copies required for projects utilizing post tension foundation design), Title 24 energy compliance documentation (Certificate of Compliance sheets shall be reproduced on actual plan sheets), structural analysis/calculations, engineered trusses layout and details (if roof/floor trusses are used), and single line diagram for electrical services over 200 amps.

Roof FramingDuring the permitting process you will be asked to pay two separate fees; Plan Check Fee and Permit Fee.
You are required to pay the Plan Check Fee before we can take in your application for plan check. As for the Permit Fee, you must pay it at time of permit issuance. Both fees are determined by the type of construction, type of occupancy and square footage. For additional information on fees, please see "Fee Information"web page.

After our Development Services Technicians (DST's) verify that the application package is complete, and you pay the Plan Check Fees, they will forward a set of plans/documents to each of the four departments/divisions; Building, Planning, Engineering and Fire. Approval from all four departments/divisions is required prior to permit issuance. To contact any of the departments/divisions, please see the contact list shown at the end of this document.

The plan check process is then tracked in our Automated Tracking System and the project is assigned a standard turn-around-time. The standard turn-around-time for an initial review is 28 calendar days. The standard turn-around-time for follow-up reviews (rechecks) is 14 calendar days.

After you obtain all the required approvals and pay the Permit Fee, a DST will issue you a building permit. Now you can start construction. At certain stages of the construction, you must schedule for an inspection. The following list represents the sequence of required inspections for a typical new single-family dwelling/duplex:

  1. Underground plumbing and electrical
  2. Foundation
  3. Roof nailing
  4. Exterior wall construction
  5. Interior framing and rough trades (electrical, plumbing, mechanical)
  6. Drywall nailing
  7. Lath nailing
  8. Gas pressure test
  9. Final Inspection

For a list of detailed information on what is to be complete for each inspection see "SINGLE FAMILY DWELLING AND ROOM ADDITION INSPECTION INFORMATION PAGE" .

After all required inspections are approved and required approvals from other divisions and/or departments are obtained, our Building Inspector will sign-off the Inspection Card and notify the utility company to release the electric meter.

City Dept. / Division
Phone Number
Fax Number

BUILDING DIVISION

(Permits Section)

619-691-5272
619-409-5428
PLANNING DIVISION
619-691-5101
619-691-5171
FIRE DEPARTMENT
619-691-5055
619-691-5057
ENGINEERING DEPARTMENT
619-691-5024
619-691-5171

 

 

City Of Chula Vista

 

 

Arrrow Back To Top  

   


©2013 City of Chula Vista. All Rights Reserved.

Employees Only